Friday, August 8, 2008
Increased Baselines
To compare our results with the GMRT coverage, we extended the maximum baseline to around 4000m from the existing 15m. The results obtained were very surprising as heavy redundancy was observed which can be seen in above image.
We have a new plan to resolve this issue. I shall put up the results soon !
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment